Sustainability

AI performance, without wasting the power behind it.

AI hardware is only sustainable if it is sized, cooled and reused properly. We build and configure
GPU systems, servers and edge devices for that reality — with Singapore's tropical climate and tight
floorspace in mind.

Reuse first THE ORDER THAT MATTERS UPGRADE IN PLACE REPAIR FIRST RECYCLE LAST

Why it matters here

In Singapore, cooling is a running cost you cannot ignore

Year-round heat and humidity mean AI racks draw cooling power every hour of the year, and floor space
is expensive. The practical answer is not a slogan: pack more useful compute per rack, cool it with
liquid where air stops working, and keep the hardware in service longer.

Tropical climate — cooling all year
Land-scarce — density matters
Green Plan 2030 — national efficiency direction
E-waste regulated under EPR

What we do

Six ways we take waste out of an AI deployment

Every engagement is a hardware decision and an energy decision at the same time. These are the levers
we work with, from the first configuration through to end of life.

Efficiency-first specification

We size to the workload you actually run — model, batch size, concurrency — instead of filling a rack
with headroom that never gets used.

Liquid cooling integration

Direct liquid cooling for high-TDP GPU and CPU builds, where air handlers stop keeping up with
sustained load in a tropical hall.

Upgrade, not replace

GPU, memory and storage refreshes inside the existing chassis where the platform supports it,
extending the service life of the enclosure, power and cooling.

Take-back at end of life

Retired systems come back to us rather than to general waste, so components are recovered and
data-bearing parts are handled first.

Data-bearing components handled first

Drives are removed and dealt with before any reuse or recycling, so a retired server does not go
back into service with customer or research data still on it.

Power & cooling reporting

Configurations are documented with their expected power draw and cooling requirement, so facilities
teams can plan capacity instead of guessing.

What this means in practice

We size by the watt, not by the spec sheet

Everything above is a claim until it changes what gets specified. This is how a configuration actually
gets decided here — the workload first, the room second, the upgrade path third.

Start from the workload

Model size, batch size and concurrency decide the GPU count. We do not add capacity for the case that
never arrives, because idle hardware draws power and depreciates at the same rate as busy hardware.

Cool it for the room

Air where air works, liquid where it stops working. The cooling decision follows the heat density and
the hall's actual conditions, not the top of a datasheet.

Leave a path to upgrade

Where a platform supports a GPU, memory or storage refresh, we say so at the point of sale — because
the second life of a chassis is what decides whether it gets replaced or extended.

Choosing hardware for a deployment? Send us the model, the workload and the room. We will come
back with a configuration sized for power and cooling — and tell you where a smaller system would do.

Talk through your configuration

Cooling & power

Liquid where air stops being enough

Dense GPU racks fail on heat long before they fail on compute. Removing that limit is an energy
decision as much as a performance one.

  • Direct liquid cooling on high-TDP GPU and CPU configurations — less fan power, steadier
    sustained clocks, heat rejected more efficiently in a tropical hall.
  • Per-deployment power profiles, so clusters do not sit at peak draw when the workload does
    not need it.
  • Rack-level sizing: power, cooling and rack space planned together with the hardware, so
    nothing is over-provisioned "just in case".
  • Redundant, hot-swap power available on servers — service without pulling the whole system.

Where it applies

Built around how different teams actually buy compute

A research lab and a retail chain do not need the same footprint, the same refresh cycle or the same
end-of-life handling. The sustainability case changes with the deployment.

AI labs & research

Dense GPU clusters where sustained throughput per watt matters, refreshed GPU by GPU inside a
chassis that is still sound.

Data centres & colocation

Rack-level power and cooling planning, liquid-ready builds and hardware that fits the density the
hall can actually support.

Education & training

Teaching clusters and workstations that stay in service for years, with upgrade paths that avoid
whole-room replacement cycles.

Enterprise IT

Server and workstation refreshes with documented power draw, so facilities and procurement plan
together rather than separately.

Branch & edge sites

Mini-PC and edge inference devices that run on a fraction of the power and cooling of a full tower
in every location.

System integrators

Repeatable configurations with consistent components, so spare parts and upgrades stay compatible
across a fleet.

Reuse, not replace

The greenest AI server is the one still in service

A GPU refresh inside an existing chassis avoids building, shipping and scrapping an entire system.
That is the circular route we design for.

Upgrade in place

GPU, memory and storage refreshed inside the existing platform where the workload allows.

Repair first

Every system we build is covered by the original manufacturer's warranty, and our published returns
and replacement policy keeps repair ahead of whole-unit disposal.

Recycle properly

Retired hardware is kept out of general waste and routed to specialist e-waste recycling
channels, with data-bearing drives removed before handover.

What we commit to

Claims we can stand behind

No invented figures

We do not publish carbon or efficiency percentages we cannot document. Where a number is needed,
it comes from the configuration sheet.

OEM warranty

Whole systems and components carry the original brand's warranty terms, and the published returns policy
keeps repair and replacement ahead of disposal.

Documented handover

Every build ships with its power, cooling and component record, so the next team inherits facts
rather than assumptions.

Local accountability

Serviced from Singapore by YUXINPC INTERNATIONAL PTE. LTD. (UEN 202329668N). Hardware we supplied is
taken back at end of life and passed to specialist third-party e-waste recyclers — not to general waste,
and not left with the customer to dispose of alone.

Planning an AI deployment in Singapore?

Tell us the model, the workload and the room it will run in. We will come back with a configuration
sized for power, cooling and rack space — not the biggest box on the list.

Request a configuration

💬✉☏